Families rethink spare rooms as colder weather moves life indoors

Spare rooms, basements and bonus rooms often sit idle until a family decides what they are for.

Colder weather moves homework, hobbies and game nights indoors, which makes winter a sensible time to plan a remodel for spring. Contractor pages that homeowners compare for remodeling Boulder tend to open with a question that fits any town: how will the room be used?

Reader’s guide

  • What: Remodeling an idle room, such as a spare bedroom, basement or bonus space, so it fits how the household spends its evenings. The plan covers layout, lighting, heating and cooling, flooring and storage.
  • Who it affects: Families with a room that goes unused, and households whose living areas have grown crowded.
  • When to act: Over the winter. Planning, estimates and any permit review take time before work starts, and contractors’ spring calendars can fill early.
  • Who to call: A licensed remodeling contractor for the whole job. Electrical, plumbing and structural work belongs to licensed trades, and the local building department can say which parts need a permit.

Start with a normal week

Contractors generally begin a remodel by asking about habits, not finishes.

A family that walks through an ordinary week hands the planner real material. The planner needs to know where the children do homework, where the laundry piles up and how many friends and cousins fill the house on a Saturday.

Those answers set the size and shape of the room. A space for game night needs seating, wall space and light that can be dimmed. A space for exercise needs a floor that takes weight and enough ceiling height for the movement. A homework room needs a door that closes.

Most families want more than one use. Planners usually advise ranking them. The top use decides the layout, and the others fit around it.

Ages change the answer. A room that suits a nine-year-old’s building sets may need to host a 16-year-old’s friends in a few years. Planners often suggest leaving open floor and plain walls, so the room can change purpose without another remodel.

A room built for a hobby has to survive the hobby. Sawdust, glue, paint and spilled drinks are hard on soft finishes, and a hard-wearing floor and washable walls hold up better over the years.

Flooring depends on the room. Over a concrete slab or in a basement, contractors choose materials for how they tolerate moisture, and they can explain which ones suit the space. Hard floors echo, and rugs or carpet soften the sound.

Storage is the item most often forgotten. Bins, equipment, board games and holiday decorations need a home, or the new room fills with clutter within a month.

Noise travels both ways. A room beside the bedrooms, or under them, carries sound through floors and walls. Contractors can explain ways to dampen it, and the choice belongs in the plan before the walls close.

Light is a concern in basements and interior rooms, where windows are few. Lighting plans for those spaces usually layer overhead fixtures with lamps, so the room works for both a movie night and a project at the table.

Bedrooms carry their own rules. A room that will sleep a guest or a teenager must meet safety requirements, such as a way out in an emergency, and the building department can explain them before the design is final.

Check the room first

Some rooms need repair before they can be remodeled.

Moisture comes first. Middle Tennessee summers are humid, and rooms below ground level or above a crawl space can hold dampness. Contractors generally look for stains, musty smells and efflorescence, the white mineral dust that collects on damp masonry, before they put up new walls.

Finishing over a damp wall hides the problem and gives mold a place to grow. A dry room is the base for everything else.

Heating and cooling come next. A finished room needs warm air in winter and cool air in summer, and the existing system may not reach it. A licensed heating and cooling contractor can say whether the equipment can carry the added space.

Electrical capacity deserves a look too. A media setup, a home gym or a hobby shop adds demands, and adding outlets, circuits or lighting is work for a licensed electrician. It is not a weekend project.

Older houses add their own questions. Farmhouses and brick homes from earlier decades can hide old wiring, plaster, settled floors and layers of paint behind the walls. Some older paint contains lead, which is harmful as dust, so professionals trained for it should test and handle it before anyone sands.

Permits are the last item on this list. Whether a project needs one depends on the work, and the local building department can say.

Money and choosing a contractor

A remodel’s total rests on a short list of drivers.

Size is the first. More floor area means more material and more hours.

Condition is the second. A room that needs moisture control, new framing or updated electrical costs more before the first coat of paint than a room that only needs finishes.

Finishes are the third, and they offer the widest range of choice. Flooring, fixtures, cabinetry and trim can run from plain to elaborate.

Hidden work matters as much. Wiring, plumbing and ducts do not show when the job is done, but they weigh on the bill. A room with a wet bar or a bathroom adds plumbing, which adds cost and permit questions.

Surprises make the last driver. Once walls open, contractors sometimes find problems no one could see. Written estimates commonly say how such discoveries are handled, and many families keep part of the budget in reserve.

A written estimate also gives families something to compare. It should list the scope, the materials and the schedule, and it should be specific enough that two estimates can be read side by side.

Homeowners generally ask whether the contractor holds the license the state requires and carries insurance. They ask who will be on site each day, how changes to the plan are priced and who requests inspections.

Schedules deserve a question of their own. A remodel that takes the main living area out of use is harder on a household than one in a basement. Contractors can lay out the order of work and say which weeks will be noisy, dusty or without power or water.

Dust control matters in a house where people still live. Homeowners can ask how the work area will be sealed off, and how the crew will protect floors and furniture along the path to it.

Payment terms belong in the agreement. Payments tied to finished stages are common, and the stages should be written down.

Reading several contractor pages before the first phone call helps. The pages show a typical process, from first visit to final walk-through, and they give a family a set of questions to bring.

Winter is long enough to plan well. A family that settles its list by February will be ready to talk with contractors when the weather turns.